No |
Employer |
Title of the
Job |
Start |
Finish |
Explanation |
1 |
Ministry
of Environment and Forests / Yolbaşı Municipality |
WWTP
Design |
25.6.2008 |
17.2.2009 |
WWTP
with a capacity of 1000 m3/day |
2 |
Ministry
of Environment and Forests / Gelinkaya Municipality |
WWTP
and Sewerage Network Design |
15.4.2008 |
15.10.2008 |
27
km sewerage network lines and WWTP with a capacity of 1000 m3/day |
3 |
The
Bank of Provinces (ILBANK) / Erdemli
Municipality |
Erdemli
(Mersin) WWTP Design |
1.6.2007 |
15.1.2008 |
WWTP
Design with a capacity of 150000 PE |
4 |
The
Bank of Provinces (ILBANK) / Sedes
Engineering |
Güre
(Balıkesir) WWTP Design |
15.1.2007 |
16.6.2007 |
WWTP
Design with a capacity of 35000 PE |
5 |
The
Bank of Provinces (ILBANK) / Altar Engineering |
Ortaca(Muğla)
WWTP Design |
13.11.2007 |
25.9.2008 |
WWTP
Design with a capacity of 50000 PE |
6 |
The
Bank of Provinces (ILBANK) / Altar
Engineering |
Tunceli
(Merkez) WWTP Design |
9.9.2006 |
20.7.2007 |
WWTP
Design with a capacity of 50000 PE |
7 |
The
Bank of Provinces (ILBANK) / Altar Engineering |
Kadirli
(Osmaniye) WWTP Design |
20.6.2007 |
31.7.2009 |
WWTP
Design with a capacity of 150000 PE |
8 |
Republic
of Turkey Ministry of Defence / ARM Engineering |
5.
Ana Jet Üs Komutanlığı WWTP Design&Sewerage Repair Project |
12.2.2008 |
20.9.2008 |
WWTP |
9 |
Republic
of Turkey Ministry of Defence / ARM Engineering |
15.
Piyade Eğitim Tugay Komutanlığı WWTP Design |
12.2.2008 |
20.9.2008 |
WWTP |
10 |
The
Bank of Provinces (ILBANK) / Erbil
Project |
Cihanbeyli
(KONYA) WWTP Design |
2007 |
2007 |
WWTP
Design with a capacity of 50 000 PE |
11 |
The
Bank of Provinces (ILBANK) |
Saimbeyli(Adana)
WWTP Design |
2010 |
2011 |
WWTP
Design with a capacity of 10 000 PE |
12 |
The
Bank of Provinces (ILBANK) |
Gaziler
(Kayseri) WWTP Design |
2010 |
2011 |
WWTP
Design with a capacity of 5 000 PE |
13 |
The
Bank of Provinces (ILBANK) / Gazipaşa
Municipality |
Gazipaşa
(Antalya) WWTP Design |
2010 |
2011 |
WWTP
Design with a capacity of 100 000 PE |
14 |
The
Bank of Provinces (ILBANK) / Ihlara
Municipality |
Ihlara(Aksaray) WWTP Design |
2011 |
2012 |
WWTP
Design with a capacity of 5 000 PE |
15 |
Karacabey
Municipality |
Karacabey
(Bursa) WWTP Design |
2012 |
2012 |
WWTP
Design with a capacity of 115 000 PE |
16 |
The
General Directorate os State Hydraulic Works |
Malkara
(Tekirdağ) WWTP Design |
2012 |
2012 |
WWTP
Design with a capacity of 50 000 PE |
17 |
Lerik
Municipality |
Lerik (Azerbaijan) WWTP Design |
2012 |
2013 |
WWTP
Design with a capacity of
100 000 PE |
18 |
Adana
Hacı Sabancı Organized Industrial Zone |
WWTP
Rehabilitation and Additional Design |
2012 |
2012 |
WWTP
Design with a capacity of 72 000 m3/day |
19 |
Kahramanmaraş
Municipality |
Kahramanmaraş
(Centrum) WWTP Design |
2013 |
2013 |
WWTP
Design with a capacity of 180 000 m3/day |
20 |
The
Bank of Provinces (ILBANK) |
Meriç
(Edirne) WWTP Design |
2013 |
2014 |
WWTP
Design with a capacity of 1 050 m3/day |
21 |
The
Bank of Provinces (ILBANK) |
Yunak
(Konya) WWTP Design |
2013 |
2014 |
WWTP
Design with a capacity of 3 600 m3/day |
22 |
The
Bank of Provinces (ILBANK) |
Türkoğlu
(Kahramanmaraş) WWTP Design |
2013 |
2014 |
WWTP
Design with a capacity of 6 200 m3/day |
23 |
The
Bank of Provinces (ILBANK) |
Darende
(Malatya) WWTP Design |
2014 |
- |
WWTP
Design with a capacity of 5 600 m3/day |
24 |
The
Bank of Provinces (ILBANK) |
Sarıkamış
(Kars) WWTP Design |
2014 |
- |
WWTP
Design with a capacity of 5 200 m3/day |
25 |
The
Bank of Provinces (ILBANK) |
Akhisar
OSB WWTP Design |
2014 |
- |
WWTP
Design with a capacity of 17 700 m3/day |