| No | Employer | Title of the Job | Start | Finish | Explanation |
| 1 | Ministry of Environment and Forests / Yolbaşı Municipality | WWTP Design | 25.6.2008 | 17.2.2009 | WWTP with a capacity of 1000 m3/day |
| 2 | Ministry of Environment and Forests / Gelinkaya Municipality | WWTP and Sewerage Network Design | 15.4.2008 | 15.10.2008 | 27 km sewerage network lines and WWTP with a capacity of 1000 m3/day |
| 3 | The Bank of Provinces (ILBANK) / Erdemli Municipality | Erdemli (Mersin) WWTP Design | 1.6.2007 | 15.1.2008 | WWTP Design with a capacity of 150000 PE |
| 4 | The Bank of Provinces (ILBANK) / Sedes Engineering | Güre (Balıkesir) WWTP Design | 15.1.2007 | 16.6.2007 | WWTP Design with a capacity of 35000 PE |
| 5 | The Bank of Provinces (ILBANK) / Altar Engineering | Ortaca(Muğla) WWTP Design | 13.11.2007 | 25.9.2008 | WWTP Design with a capacity of 50000 PE |
| 6 | The Bank of Provinces (ILBANK) / Altar Engineering | Tunceli (Merkez) WWTP Design | 9.9.2006 | 20.7.2007 | WWTP Design with a capacity of 50000 PE |
| 7 | The Bank of Provinces (ILBANK) / Altar Engineering | Kadirli (Osmaniye) WWTP Design | 20.6.2007 | 31.7.2009 | WWTP Design with a capacity of 150000 PE |
| 8 | Republic of Turkey Ministry of Defence / ARM Engineering | 5. Ana Jet Üs Komutanlığı WWTP Design&Sewerage Repair Project | 12.2.2008 | 20.9.2008 | WWTP |
| 9 | Republic of Turkey Ministry of Defence / ARM Engineering | 15. Piyade Eğitim Tugay Komutanlığı WWTP Design | 12.2.2008 | 20.9.2008 | WWTP |
| 10 | The Bank of Provinces (ILBANK) / Erbil Project | Cihanbeyli (KONYA) WWTP Design | 2007 | 2007 | WWTP Design with a capacity of 50 000 PE |
| 11 | The Bank of Provinces (ILBANK) | Saimbeyli(Adana) WWTP Design | 2010 | 2011 | WWTP Design with a capacity of 10 000 PE |
| 12 | The Bank of Provinces (ILBANK) | Gaziler (Kayseri) WWTP Design | 2010 | 2011 | WWTP Design with a capacity of 5 000 PE |
| 13 | The Bank of Provinces (ILBANK) / Gazipaşa Municipality | Gazipaşa (Antalya) WWTP Design | 2010 | 2011 | WWTP Design with a capacity of 100 000 PE |
| 14 | The Bank of Provinces (ILBANK) / Ihlara Municipality | Ihlara(Aksaray) WWTP Design | 2011 | 2012 | WWTP Design with a capacity of 5 000 PE |
| 15 | Karacabey Municipality | Karacabey (Bursa) WWTP Design | 2012 | 2012 | WWTP Design with a capacity of 115 000 PE |
| 16 | The General Directorate os State Hydraulic Works | Malkara (Tekirdağ) WWTP Design | 2012 | 2012 | WWTP Design with a capacity of 50 000 PE |
| 17 | Lerik Municipality | Lerik (Azerbaijan) WWTP Design | 2012 | 2013 | WWTP Design with a capacity of 100 000 PE |
| 18 | Adana Hacı Sabancı Organized Industrial Zone | WWTP Rehabilitation and Additional Design | 2012 | 2012 | WWTP Design with a capacity of 72 000 m3/day |
| 19 | Kahramanmaraş Municipality | Kahramanmaraş (Centrum) WWTP Design | 2013 | 2013 | WWTP Design with a capacity of 180 000 m3/day |
| 20 | The Bank of Provinces (ILBANK) | Meriç (Edirne) WWTP Design | 2013 | 2014 | WWTP Design with a capacity of 1 050 m3/day |
| 21 | The Bank of Provinces (ILBANK) | Yunak (Konya) WWTP Design | 2013 | 2014 | WWTP Design with a capacity of 3 600 m3/day |
| 22 | The Bank of Provinces (ILBANK) | Türkoğlu (Kahramanmaraş) WWTP Design | 2013 | 2014 | WWTP Design with a capacity of 6 200 m3/day |
| 23 | The Bank of Provinces (ILBANK) | Darende (Malatya) WWTP Design | 2014 | - | WWTP Design with a capacity of 5 600 m3/day |
| 24 | The Bank of Provinces (ILBANK) | Sarıkamış (Kars) WWTP Design | 2014 | - | WWTP Design with a capacity of 5 200 m3/day |
| 25 | The Bank of Provinces (ILBANK) | Akhisar OSB WWTP Design | 2014 | - | WWTP Design with a capacity of 17 700 m3/day |