+90 312 431 87 31
>

OTHER

No Employer Title of the Job Start Finish Explanation
1 The Bank of Provinces (ILBANK)  Ardeşen (Rize) Deep Sea Discharge Line Design 12.5.2008 2009 Design of deep sea discharge 
2 Bodrum Koyunbaba Hotels Bodrum Koyunbaba Hotels and Villa Projects Infrastructure Design  2010 2011 Sewerage, Storm water, Drinking Water Network designs
3 Bodrum Demirbükü Hotels Bodrum Demirbükü Hotel Infrastructure Design 2010 2011 Sewerage, Storm water, Drinking Water Network designs
4 The Bank of Provinces (ILBANK)  Biga(Çanakkale), Kadirli(Osmaniye) , Reyhanlı    ( Hatay) WWTP Feasibility Study and Environmental Manangment Plan Preparation 2012 2012 Preparation of feasibility study and environmental management plans for international funding
5 Samsun Water&Wastewater Directorate Samsun Deep Sea Discharge Design 2012 2012 2.4 km Ø1600 mm line
6 Lerik Municipality Lerik  (Azerbaijan) Reservoir Design 2012 2013 100 m3, 400 m3, 500 m3 Reservoir Design
7 Osmaniye Municipality Osmaniye (Centrum) Sewerage&Storm-water Feasibility Study and Environmental Manangment Plan Preparation 2013 2014 Preparation of feasibility study and environmental management plans for international funding
8 TML Construction Company  Misurata Free Zone Infrastructure Works, Libya 2013 - Public Infrastructure Consulting Services
9 TEPE Constructions TTOPCO Permanent Camp 2013 - Public Infrastructure Design Services